Supporting record of the tests for the Certificate of Compliance for Electrical Work (CCEW). The official certificate is the one issued through Building Commission NSW.
CustomerMs Sam Citizen
Address12 Example Street, Parramatta, 2150
Date of test8 October 2026
Contractor licence00000 · Example Electrical
Work tested
Kitchen renovation: new 20 A power circuit, oven circuit and LED downlights. Added RCBOs to the switchboard.
| Circuit | Description | Cable | Protection | IR (MΩ) | Cont. (Ω) | Polarity | Conn. | RCD | EFLI (Ω) |
|---|
| 1 | Kitchen power | 2.5 mm² TPS | 20 A RCBO 30 mA | >200 | 0.42 | ✓ | ✓ | Pass · 18 ms | 0.78 |
| 2 | Lights, living and beds | 1.5 mm² TPS | 10 A RCBO 30 mA | >200 | 0.65 | ✓ | ✓ | Pass · 21 ms | 1.12 |
| 3 | Oven | 6 mm² TPS | 32 A RCBO 30 mA | >200 | 0.18 | ✓ | ✓ | Pass · 16 ms | 0.51 |
IR = insulation resistance · Cont. = earth continuity · Conn. = correct circuit connections · RCD = trip test (and trip time) · EFLI = earth fault-loop impedance (N/A: not required, no socket-outlets)